Tuesday, September 21, 2010

Bringing in the heavy equipment


We rented a manlift to help get the floor plywood for the second floor lifted. Mike got on it as soon as we got there Saturday morning and within 10 minutes has it stuck in the mud. Good thing we didn't need it until later in the afternoon. He pushed it out with the excavator that was still on the property.

No comments:

Post a Comment