We had to get all of the braces put in place before we started putting the top on the pier. Those are 2 x 8 x 20's. They were heavy and not so easy to get all the way to the other end of this pier. Once the boards were pulled to place, we put in a water line and an electrical line for later.
No comments:
Post a Comment